Go to the mail module / exchange module 

Select scheduling.

Here you can define based on what criteria a mail must be scheduled such as the reportname from AX / Operations or if used the RecognizedReport jobinfo

image

image

image

On the times tab you have multiple options to configure the requirement. Such as.

image